Johan Sverdrup construction can improve, safety body says

The Norwegian safety body, the Petroleum Safety Authority (PSA), has found one improvement point during an audit of bridges and flare booms fabrication for the Johan Sverdrup project.

The safety watchdog said on Friday that the identified improvement point was in relation to the continuous improvement of execution of fabrication.

According to the PSA, the audit, conducted on September 7 and 8, revealed no non-conformities.

The audit of the fabrication of bridges and flare booms and Statoil’s follow-up on the Johan Sverdrup project was performed at the premises of Rosenberg WorleyParsons AS. Also, spot checks of the production of procedures and documentation for pipe systems and structures were done by the watchdog.

The PSA added that the objective of the audit was to monitor if the project was planned and carried out in compliance with applicable regulations and recognized norms and that requirements in the HSE regulations are provided for. The PSA also made a follow up of Statoil’s follow-up of the fabrications.

The PSA said that Statoil was given a deadline of November 2017 to report on how the improvement point will be addressed.

In September, Norwegian oil company Statoil said it completed nearly 60 percent of the Phase 1 of the Johan Sverdrup project in the North Sea while further reducing the gross capital expenditure by NOK 5 billion to NOK 92 billion ($11.8B).

Johan Sverdrup

Johan Sverdrup is one of the five largest oil fields on the Norwegian continental shelf. The field is being developed in several phases. The total resources at the field are estimated to between 2.0 and 3.0 billion barrels of oil equivalent.

The Phase 1 consists of four platforms which make up the planned field center for Johan Sverdrup. Phase 1 is expected to start up in late 2019 with production capacity estimated at 440,000 barrels of oil per day.

Phase 2 is expected to start up in 2022, with full field production estimated at 660,000 barrels of oil per day. Peak production on Johan Sverdrup will be equivalent to 25% of all Norwegian petroleum production. Concept decision for Phase 2 was made earlier this year and the selected concept consists of another process platform (P2), modifications to the riser platform and subsea wells.

Share this article

Follow Offshore Energy Today

Events>

<< Oct 2017 >>
MTWTFSS
25 26 27 28 29 30 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

THE 5TH OIL & GAS VIETNAM 2017

The 5th edition of Oil & Gas Vietnam (OGAV) exhibition 2017 is the only specialized event in Vietnam that brings together an international…

read more >

24th Annual Africa Oil Week 2017

The Conference portraying five days of senior-level executive insights, with rich-content on corporate strategies and portfolio, exposure…

read more >

OTC Brasil 2017

OTC Brasil is organized by the Offshore Technology Conference (OTC) and Brazilian Petroleum, Gas and Biofuels Institute (IBP)…

read more >

BLACK SEA OIL AND GAS

Black Sea region continues to impose as a key area for the future of energy in Europe in reaching the diversification of supply and the energy…

read more >

Jobs>

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you’ll reach countless professionals in the sector. For more information, click below...

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you’ll reach countless professionals in the sector. For more information, click below...

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you’ll reach countless professionals in the sector. For more information, click below...

apply