Oil Production Begins from Tubarão Martelo Field

Oil Production Begins from Tubarão Martelo Field

The production in the OGX-operated Tubarão Martelo field, located in the BM-C-39 and BM-C-40 blocks, offshore Brazil, started through the horizontal well TBMT-8H.

In November 29, 2013 the Company received the Operating License from IBAMA (the Brazilian Institute for Environment and Renewable Natural Resources), authorizing the operation of FPSO OSX-3 and the respective subsea structures related to the oil production development and outflow for the BM-C-39 and BM-C-40 blocks, located in the Campos Basin.

With 370 meters length, 57 meters breadth and 31 meters depth, the FPSO OSX-3 is composed of 16 modules and has production capacity of up to 100,000 barrels of oil per day and storage capacity of up to 1,300,000 barrels.

December 06, 2013

 

Share this article

Follow Offshore Energy Today

Events>

<< May 2015 >>
MTWTFSS
27 28 29 30 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

2nd Annual Routine Maintenance GCC Summit

This year, the summit will discuss cost optimisation strategies and best practices that can help in improving equipment reliability whilst…

read more >

5th Conference and Exhibition – China Sourcing Summit On Petroleum & Chemical Equipment (CSSOPE 2015)

The CSSOPE 2015 is the most important event in the industry with four years successful experiences…

read more >

Offshore Well Control 2015

Safety Culture: Access innovative case studies on safety culture and leadership to ensure quality control, risk mitigation and process…

read more >

SPE Artificial Lift Conference- Latin America and Caribbean

This conference will combine all aspects of the artificial lift system and all the interrelated components and methodologies, thereby…

read more >

Jobs>

Assistant Driller

Maersk Drilling Norge AS was established in 1990 and employs a staff of approximately 1000 people.

apply

QC Coordinator Offshore

Do you attach great importance to quality and do you have an affinity with offshore projects? Then read about what Van Oord can offer you.

apply

Electrician

For one of our clients we are looking for a Ships Electrician. Our client is a company with worldwide activities. You will work in a rotation of 4 till 6 weeks on and off.

apply