Johan Sverdrup safety and electrical facilities need improvement, PSA says

The Petroleum Safety Authority (PSA) has found several improvement points during an audit of the Johan Sverdrup living quarters platform (LQ).

Johan Sverdrup phase 2 illustration. Source: Equinor; Photographer: TRY

PSA said on Thursday that the audit, conducted on January 24, looked at how operator Equinor managed safety systems and electrical facilities on the Johan Sverdrup LQ.

According to the safety body, the objective of the audit was to verify that Equinor’s management and follow-up of safety systems and electrical facilities in connection with readying the LQ for operation complied with the authorities’ requirements.

The audit involved a presentation of experiences and statuses of completion of systems and facilities, outstanding work and any plans for work that needs to be performed offshore.

The PSA added that there was work still outstanding on certain safety systems and electrical facilities.

During the audit, the safety watchdog identified two improvement points regarding deficiencies in the storage of safety equipment for switchrooms and deficient reviewing of reference documents in electrotechnical analyses.

PSA told Equinor to report on how the improvement points would be addressed by April 1, 2019.

 

Johan Sverdrup

The giant Johan Sverdrup oil field in the North Sea offshore Norway is being developed in two phases.

The first phase involves the establishment of a field center consisting of four platforms, including a utility and living quarters platform, a processing platform, a drilling platform, and a riser platform, three subsea installations for water injection, power from shore, export pipeline for oil (Mongstad) and gas (Kårstø).

The platforms will be interlinked by gangways. This phase is expected to start production in November 2019.

The second phase covers the development of another processing platform, modifications of the riser platform and the field center, five subsea templates, in addition to power from shore to the Utsira High in 2022. Production start expected in the fourth quarter of 2022.

In recent project news, Boka Vanguard, the world’s largest heavy lift and transportation vessel, reached Norway last month after a two-month journey from South Korea carrying the Johan Sverdrup field processing platform topside.

Equinor is the operator of the Johan Sverdrup field with a 40.0267% interest, and its partners are Lundin Norway (22.6%), Petoro (17.36%), Aker BP (11.5733%), and Total (8.44%).

Share this article

Follow Offshore Energy Today

Events>

<< Oct 2019 >>
MTWTFSS
30 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3

Executive Oil Conference & Expo 2019

Executive Oil Conference and Exhibition is a unique opportunity to meet with all of the region’s…

read more >

Oil & Gas Vietnam 2019

Oil & Gas Vietnam (OGAV) 2019 is the only specialized oil & gas event in Vietnam that brings together an international congregation of both upstream and downstream oil and gas companies and also its supporting industries gathered in the heart of Vietnam’s oil and gas industry in Vung Tau, to showcase the latest developments in the oil and gas industry.

read more >

Jobs>

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply