Offshore safety body looks at West Mira rig ahead of AoC award

Norwegian offshore safety watchdog, the Petroleum Safety Authority (PSA), has found irregularities during two audits of the West Mira drilling rig.

West Mira rig; Image author: Neil Robertson; Image shared with permission from the photographer

The PSA said on Wednesday that both audits were conducted in connection with an application for an Acknowledgement of Compliance (AoC) for the West Mira rig.

One of the audits, conducted from May 12 to 14, focused on the electrical facilities and technical safety on board the West Mira while it was berthed at the CCB yard in Ågotnes.

The other, done from May 24 and 28, looked at Seadrill’s management and follow-up of the working environment on the rig.

During the audits, the West Mira was in the process of being prepared for operation on the NCS. The semi-submersible Moss CS60 design rig will be owned and operated by Seadrill Europe Management AS.

 

‘All non-conformities must be rectified’

 

The objective of the first audit was to verify the technical condition and relevant parts of the management system to monitor that requirements in the petroleum regulations were being met.

During the audit, the PSA found eleven non-conformities and one improvement point.

The other audit focused on the status of conformity assessments of the rig’s technical condition, organization, and management systems relative to the regulatory working environment requirements for West Mira.

The offshore regulator identified four non-conformities as well as one improvement point.

The PSA added that Seadrill was supposed to report on how the non-conformities and improvement points were addressed by August 12 for the electrical facilities and technical safety audit and by July 24 for the working environment probe.

For the PSA to issue an AoC, all known safety-critical non-conformities must be rectified, and the rig must have been issued with maritime certificates from the relevant flag state.

Nova contract

Seadrill will operate the West Mira during drilling operations on the six Nova field wells. The rig is contracted the for work on Wintershall Dea’s Nova in June 2018. The contract includes options for an early start in 3Q of 2019, as well as follow-on options.

Should all options be exercised, West Mira is expected to be contracted to Wintershall until the first quarter of 2022.


Spotted a typo? Have something more to add to the story? Maybe a nice photo? Contact our editorial team via email.

Also, if you’re interested in showcasing your company, product or technology on Offshore Energy Today please contact us via our advertising form where you can also see our media kit.

Share this article

Follow Offshore Energy Today

Events>

<< Oct 2019 >>
MTWTFSS
30 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3

Executive Oil Conference & Expo 2019

Executive Oil Conference and Exhibition is a unique opportunity to meet with all of the region’s…

read more >

Oil & Gas Vietnam 2019

Oil & Gas Vietnam (OGAV) 2019 is the only specialized oil & gas event in Vietnam that brings together an international congregation of both upstream and downstream oil and gas companies and also its supporting industries gathered in the heart of Vietnam’s oil and gas industry in Vung Tau, to showcase the latest developments in the oil and gas industry.

read more >

Jobs>

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply