Orga Offshore installs Circle-H helideck lights on Ensco rigs

Orga Offshore has installed its innovative CAP 437-compliant Circle – H LED touchdown, positioning and heliport dentification marking system on Ensco’s jackup drilling rigs ENSCO 70 and ENSCO 80.

 

The latter marks the fifth installation for Orga in as many weeks and with orders to deliver and install 550 certified Circle-H helideck lighting systems over the next three years, Orga says that offshore helicopter landings look set to become a whole lot safer.

Developed in collaboration with the UK Civil Aviation Authority (UK CAA) to improve visibility for approaching pilots in all weather conditions, Orga’s ATEX and IECEx (Zone 1 and 2) certified touchdown/positioning and marking (TD/PM) Circle – H helideck lighting system was installed by Wellhead Electrical Supplies, while both drilling rigs were undergoing upgrade and maintenance work at Able Seaton Port.

Older platforms present a considerable challenge when installing the mandatory TD/PM Circle and H helideck lighting scheme.

Mounting Orga’s flat Circle – H lighting plates on an old deck’s irregular surface requires meticulous planning, a precise procedure and the correct tools to ensure a perfect safe fit in accordance with CAP 437, the UK CAA’s internationally acknowledged guidance on standards for offshore helideck landing areas, Orga explains in its press release.

Circle – H installation works on both Ensco rigs were completed on budget and in a short period of time, however, Jan-Willem de Boer, Services and Commissioning Engineer at Orga is keen to point out that Orga’s deeply
embedded safety culture is central to each Circle – H installation and the number one priority is safety.
Jan-Willem de Boer said: “Our main focus is on safety and not the time it takes to complete a job. Orga’s Circle – H helideck lighting solution is a safety system designed for safer helicopter landings and to be safe to walk on with no trip hazards. Everything must be installed very carefully so that the installation remains safe and secure even after thousands of landings.” 

He said: “It is our steadfast commitment to quality, safety and integrity which shapes decision-making at every level to produce a thorough and comprehensive installation procedure, identify the right tools and select the right people for each job. We are very proud to be the first with a safe helideck lighting system like this.”

 

Press Release, May 13, 2014

 

Share this article

Follow Offshore Energy Today

Events>

<< Nov 2018 >>
MTWTFSS
29 30 31 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 1 2

OSEA2018 International Conference

The OSEA International Conference is regarded as one of the preferred knowledge exchange platforms in the region and with over 18,000…

read more >

IMCA Annual Seminar

The focus of this year’s seminar is on the industry finding new strategies and ways of working in today’s…

read more >

Mauritanides 2018

Mauritanides (11-13 Dec 2018) is the foremost and largest event for companies seeking to invest in the Mining…

read more >

Jobs>

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply