Santos ready to start coring at Dorado appraisal well

Australian energy giant Santos has drilled the Dorado-2 appraisal well located offshore Western Australia to the coring point near the 4,000-meter mark and is now preparing to start coring across the Caley and Baxter members.

Noble Tom Prosser rig. Source: Noble Corp.

The Dorado-2 appraisal well, located in WA-437-P, was spud at the beginning of May 2019, using the Noble Tom Prosser jack-up rig.

Santos is the operator of WA-437-P and Carnarvon Petroleum is its partner with a 20% interest.

Carnarvon said on Tuesday that, since the last report the 12-1/4” hole was drilled, 9-5/8” casing was set and cemented in place, and the 8-1/2” hole was drilled to the coring point of around 3,935 meters (measured depth).

The company added that Santos was preparing to start coring across the Caley and Baxter members.

It is planned to acquire around 200 meters of whole bore core across the Caley and Baxter members before continuing drilling, with logging while drilling tools to a planned total depth of around 4,500 meters.

Once the well has been drilled to the total depth, the plan is to run wireline logging tools across the relevant reservoir sections.

“Due to the nature of coring operations, no information will be available to the joint venture during the coring process,” Carnarvon stated.

Dorado-2 is the first appraisal well of the Dorado oil and gas field which was discovered in the latter half of last year.

Dorado-1 discovered hydrocarbon-bearing reservoirs in the Caley, Baxter, Crespin, and Milne Members of the Lower Keraudren Formation.

The Dorado-2 well is located approximately 160 kilometers north-northeast of Port Hedland in the Bedout Sub-basin. Drilling is in approximately 95 meters water depth with the Dorado-2 location being around 2.2 kilometers away from the Dorado-1 discovery location.

Following the Dorado-2 well, Santos plans to drill the Roc South-1 exploration well and, after that, the Dorado-3 appraisal well.

Roc South is within close proximity to Dorado, just 13 kilometers away from the Dorado crest. Dorado-3 plans to include drill stem tests will assist with reservoir performance and obtain fluid samples required for the design of the Dorado production facilities.


Spotted a typo? Have something more to add to the story? Maybe a nice photo? Contact our editorial team via email. Offshore Energy Today, established in 2010, is read by more than 10.000 industry professionals daily.

We had almost 9 million page views in 2018, with 2.4 million new users. This makes us one of the world’s most attractive online platforms in the space of offshore oil and gas.

These stats allow our partners advertising on Offshore Energy Today to get maximum exposure to their online campaigns. If you’re interested in showcasing your company, product or technology on Offshore Energy Today contact our marketing manager Mirza Duran for advertising options.

Share this article

Follow Offshore Energy Today

Events>

<< May 2019 >>
MTWTFSS
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

Executive Oil Conference & Expo 2019

Executive Oil Conference and Exhibition is a unique opportunity to meet with all of the region’s…

read more >

Oil & Gas Vietnam 2019

Oil & Gas Vietnam (OGAV) 2019 is the only specialized oil & gas event in Vietnam that brings together an international congregation of both upstream and downstream oil and gas companies and also its supporting industries gathered in the heart of Vietnam’s oil and gas industry in Vung Tau, to showcase the latest developments in the oil and gas industry.

read more >

Jobs>

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply