SCV Far Sleipner delivered to Farstad

Farstad Shipping ASA has today, March 26, 2015, taken delivery of subsea-/construction vessel Far Sleipner (Vard 3 07) from Vard Langsten.

The vessel is designed for subsea construction/IMR operations to 3,000 meters water depth, has an overall length of 142.6 meters, beam of 25 meters and a deck area of 1,800 m². The vessel is equipped with two offshore cranes, of which the larger one has a lifting capacity of 350 tons. Furthermore, the vessel is arranged for 3 pc ROV (Remote Operating Vehicles) and accommodation for 130 persons.

The vessel will enter into a charter contract to Technip for a period of approx. 11 months, divided into two firm periods. Including mobilization and demobilization, Technip may utilize the vessel for a period up to 16 months.

The long-term financing of the vessel is arranged by Eksportkreditt Norge AS, DNB, Swedbank and GIEK.

Share this article

Follow Offshore Energy Today

Events>

<< Nov 2019 >>
MTWTFSS
28 29 30 31 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 1

Offshore Energy Exhibition and Conference (OEEC) 2020

Offshore Energy addresses the technical, operational and commercial challenges associated with future sector growth.

read more >

Jobs>

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of OffshoreEnergyToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply