Iran Puts into Action 14 Mega Projects in South Pars Field
Iran is implementing 14 mega projects in its giant South Pars field that are scheduled to be completed in 35 ...
read more →Brazil: Sevan Driller Could Be Back in Action Soon
Further to announcements made on November 5, 8 and 19, 2010, all ten ST locks on the BOP have been replaced. The ...
read more →Brazil: Sevan Driller Back in Action
In reference to the announcement made on September 17, 2010, the defects in the riser tensioning systems that ...
read more →Singapore: EOC*S Lewek Arunothai FPSO Back in Action
EOC Limited (EOC or the Group), one of Asia’s leading operators of offshore construction & floating ...
read more →Brazil: Sevan Driller Back in Action by the End of September
Defects in the riser tensioning systems (DAT cylinders) in the drilling package, have caused a stop in the drilling ...
read more →