Upturn in Energy Sector Travel for Wings

But Traveller Safety Still Top Priority

Woodside working on terms with NWS to process Browse gas

Woodside aims to finalize commercial terms to process Browse gas through existing infrastructure of the NWS project ...

read more →

Woodside: First gas from Browse expected in mid-2020s

Woodside First gas from Browse expected in mid-2020s

Australian oil and gas company Woodside expects first gas from its Browse basin fields offshore Australia to start ...

read more →

Wood Group nets its third Browse FLNG FEED

Wood  Group has secured its third front-end engineering and design (FEED) contract for the Woodside-operated ...

read more →

Wood Group wins more Woodside FLNG work (Australia)

Wood Group, an international oilfield services provider, has secured its second front-end engineering design (FEED) ...

read more →

PHOTO: Ichthys LNG lays three subsea manifolds on seabed

Ichthys LNG Project has landed three more subsea production manifolds on the seabed, bringing the total to four. ...

read more →

Wood Group scoops Browse FLNG FEED

Wood Group has secured a new contract to carry out front-end engineering and design (FEED) for the ...

read more →

Browse FLNG FEED to OneSubsea

OneSubsea, a Cameron and Schlumberger company, has been awarded a front-end engineering and design (FEED) contract ...

read more →

Samsung Heavy Industries bags $4.7B order for three FLNGs

South Korea’s Samsung Heavy Industries has said that it has won an order to build three Floating LNG ...

read more →

Woodside postpones Browse FEED

Australian oil and gas company Woodside, as operator of the Browse FLNG Development, has advised that a revised ...

read more →

Woodside calls for public input on Browse FLNG EIS

Australian oil and gas company Woodside has called for public review of its Development Draft Environmental Impact ...

read more →

IPB: ‘Stena Clyde’ to arrive at Pryderi ...

IPB Petroleum has advised that the WA-424-P Joint Venture have received notice from the rig contractor that the ...

read more →

Origin, Karoon wrap up Browse basin transaction

Origin Energy Limited has completed the acquisition of Karoon Gas’ 40% stake in two offshore exploration ...

read more →

Woodside: 1Q Production rises. Browse FLNG FEED ...

Woodside Energy, an Australia-based oil and gas producer, today announced its 1Q 2014 output volumes rose 5 ...

read more →

Woodside Wants Three FLNG Facilities at Browse

Australian oil and gas giant Woodside, which on Monday recommended the Browse Joint Venture to develop the Browse ...

read more →

Australia Paves Way for Browse FLNG

Australian Resources Minister Gary Gray today announced his decision to vary conditions on five Browse retention ...

read more →

Australia: Premier Barnett Pushes for James Price Point ...

The Australian State Government will press ahead with the acquisition of the land for a gas precinct near James ...

read more →

Santos Discovers Gas in Browse Basin Offshore W. Australia

Santos today announced a gas discovery at the Bassett West-1 exploration well in WA-408-P, located in the Browse ...

read more →

Karoon Provides Update on Browse Basin Drilling ...

At 06:00 WST on the 3rd of May, Proteus‐1 well, located in the Browse basin offshore W. Australia, had reached its ...

read more →

Premier Barnett: “Browse FLNG is a missed ...

Premier of Western Australia, Colin Barnett, has greeted the news that Woodside is not going ahead with the ...

read more →

Woodside Shelves Browse LNG Development Project (Australia)

Australia’s Woodside has completed its technical and commercial evaluation of the proposed Browse ...

read more →

Woodside Gets Nod to Sell Browse Development Stake to ...

Woodside Gets Nod to Sell Browse Development Stake to MIMI (Australia)

Further to Woodside’s announcement on 1 May 2012 that Japan Australia LNG (MIMI Browse) Pty Ltd (MIMI) offered to ...

read more →